“Right now, we’re spending around $1 million a day,” says Nelson. The airport will be easier to use, more efficient, and sustainable, with a LEED Gold certification the goal. ![]() “We basically designed the baggage system and built the airport around it,” says Nelson noting that oversize items such as skis and bikes were accounted for, instead of as an afterthought. “This is the biggest construction project ever in the state of Utah,” says Leon Nelson, construction director for the project, “all while maintaining current operations as much as possible.” Over 1,500 construction workers are installing baggage carousels, placing windows, building bathrooms and pouring concrete. And talk about convenient, a Trax station will be right next to the new terminal, and your trip to a rental car is just a few steps, not a bus-ride, away. The economy parking lot has already been completed. An d the new-fangled waiting area not only has a gas station, but convenience store and food options.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |